Year 2004

Bronz Otomotiv was established in 2004 at Ostim Organized Industrial Zone.

Year 2008

In 2008, a sheet metal laser machine investment was made.

Year 2014

Moved to its 1.000m2 place in Sincan OSB in 2014

Year 2015

In 2015, a state-of-the-art Water Jet Machine investment was made.

Year 2016

In 2016, it provided parts for the Kayseri’s 100% local Tramway project and supported the project.

Year 2017

In 2017, it was moved to its 10.800m² place at Başkent OSB (The Capital’s Organized Industrial Zone), it expanded its machine park and capabilities as well.

Year 2018

In 2018, 3D Faro measuring instrument investment was made to increase measurement capabilities.

In 2018, it added Rotor and Stator parts production to its product library.

Year 2019

In 2019, it received the IATF 16949:2016 quality system certificate from the Tüv Nord certification body to strengthen the quality system.

In 2019, a stand was opened at the CWIEME Berlin Energy fair.

Stator laminations and Rotor Rim Sheet parts were delivered to the Kars Karakurt Dam project in 2019.

Rotor and Stator parts were delivered to 3 different dam projects abroad in 2019.

Year 2020

In 2020, Canias ERP system investment was completed and started to be used.

In 2020, data started to be taken from all machines under the name of Industry 4.0.

By signing a contract with the Global OEM automotive company in 2020, mass production had started.

In 2020, 3 units of Rotor Rim Sheet parts of Artvin Yusufeli dam were delivered.

Year 2021

In 2021, investment in the fourth Fiber Laser machine that can make precision cuts has been made.

In 2021, our company won the bid for the Stator lamination parts of the Ankara Sarıyar Dam’s 1st unit Rehabilitation project.

In 2021, a project application was made on the side parcel to increase the existing closed area capacity.

Year 2022

In 2022, the investment for the 5th Fiber Laser machine, capable of precision cutting, was made.

In 2022, the existing ISO 45001 and 14001 documents were integrated into the system from the Tüv Nord certification body.

In order to increase the measurement capabilities in 2022, an investment of 1000×1000 mm VMS Coordinate Measurement tool was made.

In 2022, a construction project was started on the adjacent parcel in order to increase the existing closed area capacity.

Year 2023

In 2023, the number of laser cutting machines has been increased to 7 with the investment of Fiber Laser machines that can perform 6kW and 9kW precision cuts.

In 2023, the rooftop Solar Power plant with a power of 588kWp and an annual power generation capacity of 700,000 kWh was commissioned.

Year 2024

In 2024, a construction project on the adjacent parcel was completed to increase the existing indoor capacity.